STAK Energy
STAKEnergy
NORTH SLOPE · ALASKA
OFF-GRID ENERGY · COMPUTE INFRASTRUCTURE
Stranded gas. Stranded no more.
Compute power where the energy is.
Megawatts on the North Slope.
Off-grid by design.
Tap anywhere to explore
v1 · Booth Kiosk Prototype
Scan to fill the form on your phone
STAKEnergy

CONFIGURE YOUR LOAD

Workload Type

Power Need

Estimated
25 MW
1 MW100 MW1 GW+

Illustrative configuration

Estimated power cost ILLUSTRATIVE
$0.03 / kWh
All-in, behind-the-meter at well-head.
Latency to major hubs PRELIMINARY
Seattle 80ms · SF Bay 95ms · Ashburn 120ms
Round-trip estimates over private fiber backbone.
Lead time to power ILLUSTRATIVE
9 months from contract
Subject to permitting and equipment lead times.
STAKEnergy

TALK TO US

STAKEnergy

 

Thanks — we'll be in touch.

Your details just landed with the STAK Energy team. Returning to the booth in a moment.

STAKEnergy

INSIDE STAK

Coming soon

The STAK Energy website is being finalized. Ask Christian for early access, or tap "Talk to us" and we'll send the link.